Timber piles ended up pushed in to the ground by hand or holes have been dug and crammed with sand and stones.• Reduced strain integrity testing, where by a small hammer transmits a strain wave along the pile length plus the returning echo is analyzed, very like sonar; and• Without concrete fill, as open ended or shut ended pipe piles: These ar